LESCO Shutdown Schedule 17 November 2026: 218 Feeders Off From 9 am to 2 pm in Lahore, Kasur, Sheikhupura, Okara and Nankana
LESCO shutdown schedule for 17 November 2026: 218 feeders in Lahore, Kasur, Sheikhupura, Okara and Nankana, off from 9 am to 2 pm. Find your feeder and grid.
یہ صفحہ اردو میں پڑھیں
LESCO has approved power shutdowns on 218 feeders on Tuesday 17 November 2026, and 215 of them are listed from 9 am to 2 pm. The cuts cover Lahore, Kasur, Sheikhupura, Okara and Nankana. Kasur circle has the longest list with 54 entries, and the DHA-1 grid in Lahore's Defence area alone has 33 feeders off.
The work is annual maintenance, tree trimming, jumper repairs and safety shutdowns, according to the remarks column in LESCO's approved list. Find your grid station and feeder below, then check the feeder name printed on your bill.
218 LESCO feeders are on the 17 November shutdown list
LESCO's file "Approved Shut Down on 17-11-2026" has 218 numbered rows across all nine circles. Kasur has 54, Southern Lahore 47, Northern Lahore 34 and Sheikhupura 21. Every timed row reads 0900 to 1400.
| Circle (CIR number) | Entries on 17 November |
|---|---|
| Kasur (7) | 54 |
| Southern Lahore (5) | 47 |
| Northern Lahore (1) | 34 |
| Sheikhupura (6) | 21 |
| Okara (4) | 19 |
| Industrial division (9) | 15 |
| Nankana (8) | 14 |
| Eastern Lahore (3) | 10 |
| Central Lahore (2) | 4 |
| Total | 218 |
Three Kasur circle rows print no time: Siddique Sons and M/S Premium Aluminium on the Lullyani grid, and Rao Khan Wala in Kot Radha Kishan. Treat those as part of the same day's work and plan for the 9 am to 2 pm window.

Lahore city feeders off from 9 am to 2 pm
Lahore's four city circles have 95 entries. The biggest block is the 132 kV DHA-1 grid in Defence, with 33 feeders including Phase V and Phase VII blocks, Askari-XI and Sector feeders. Chah Miran grid has 18 more across Northern and Eastern Lahore.
- 132 kV DHA-1 (V and VI): Mota Singh Wala, Gohawa, Hair, L-Block Phase-V, D-Block Phase-V, Askari-XI, B.D-1, B.D-3, B.D-5, DHA Phase-VII (B.D-12), Express, Express-3, Express-5, Pace Wood, Sector A, Sector A and B, Sector G, Sector K, Sector M, Sec M F2, F3 and F4, Sec SBF-1 and SBF-2, Leel, Babu Mehar Town, Haji Park, Feeder 1-A, Feeder-09, -13, -15 and -16, and Backup Phase-V.
- 132 kV Chah Miran: Amir Road, Chah Miran, Fazal Pura, Misri Shah, Makhan Pura, Sultan Pura, Umar Din Road, Taj Pura, Akram Park, Darbar Hazoori, Bilal Park, Wassan Pura-2, Jani Pura, Zahid Furnace, Suleman Park, Ghorray Shah, Madho Lal Hussain and K K Saeed Hospital.
- 220 kV NKLP (Kot Lakhpat): Sufiabad, Atari Darbar, Dalloki, Industrial No.3, C-3 and four more rows by code.
- 132 kV Green View: Sayial, Teneries, Rachna Glass, New Modern Steel, Siddiq Leather, Ahmad Glass, Infinity Eng, Al Jaleel Garden, Wahgray and six more rows by code.
- Other Lahore grids: Pir Makki (Bhati Gate), Fawara Chowk and Circular Road (Mochi Gate), Bakar Mandi and Kot Muhammadi (Sabzazar), Islam Steel, Rachna Town and Industrial (P) (Shamkey), Kamas (Punjab Small), National Town and Nila Gumbad (Rewaz Garden), Ravi Block (Saidpur), Bagarian (Wapda Town), Mughal Pura and Cantt (Fateh Garh), Lakhodair (Shalamar-I), Hussain Road (Ghazi New), Must Iqbal and Children Hospital (Old Kot Lakhpat), and Mini Market (Rehman Park).
Kasur, Sheikhupura, Okara and Nankana feeders
Outside Lahore, Kasur circle leads with 54 rows, mostly on the Pattoki, Lullyani, Ellahabad and Manga Mandi grids. Sheikhupura has 21, Okara 19 and Nankana 14. Another 15 factory feeders, most on the 220 kV Sarfraz Nagar grid, sit in the industrial division.
- Kasur: Old Katchery Pattoki, New Mandi Chunian, Old Mandi, Kacha Pakka, Nazam Pura, Hanjra Kalan, Jago Wala, Pahadana Hallah, Defence View, Gulshan e Subhan (Pattoki grid); Scarp Kasur, Lakhneki, Naqeeb Abad, Queen Mary College and factory feeders (Lullyani); Due Khara, Mastowal, Baqa Pur, City, Noor Pur, Pakhoo Ki (Ellahabad); Dholan, M.U.Wala, PLU, Tatara Kamil, Bakar Kay (Khuddian); Kot Asad Ullah, Nathay Khalsa and mill feeders (Manga Mandi); K.R.K City-II and Zafar Kay (Kot Radha Kishan); Haji Chand and Jhang Abdullah Shah (Mandi Ahmad); Manga No-1 and Manga Mandi-II (Bhai Pheru); Kalas Chunian (Kanganpur).
- Sheikhupura: Safdar Abad, Khanqa Dogran, Rehmanabad, Ratti Tibbi, Booray Wala (Khanqah Dogran); Kala Khatai, Rustampur, Narang City, Narang More, Muslim Park (Narang); Khalid Road, A.M.K and Hirran Minar (Sheikhupura); Chand Bagh and Muridkey (Muridkey); Gulistan Park (Sharaqpur Road).
- Okara: Kanedy, Mustafa Abad, Rao Ajmal, Peer Di Hatti, J.S.K, Mehtab Wala, Souvenir, Rafique Jameel (Depalpur); Abdullah Hospital, Karmanwala, Ghazi Abad, Madina Super Market, Mehmood Shaheed, Capital City, Adda Ksan (Okara City); Munawwar Shaheed and Sharif Abad (Haveli Lakha); Gehlan (Basir Pur); Bama Bala (Renala Khurd).
- Nankana: S-1, S-4, Farooq Nager and Panwan (Shahkot); S-2 (Sangla Hill); F.No.4 Kot Tahir and F.No.6 Barkhurdar (Bucheki); C-3 Jharay Kalan and G-8 Aswan Tentage (Malik Pur); Lassani (Mohlan); Mahmu Wali (Warburton).
Twenty rows on the list show a feeder code without the name beside it, because the name is printed on a separate line. They sit on the Green View, NKLP, Farooqabad, Bhai Pheru, Pattoki, Ali Jaj and Valgon Sohail grids. If your area is near one of those grids, check the PDF itself.
Check your feeder in five steps
Your bill names your feeder and subdivision. Open LESCO's shutdown page, open the 17 November file, and match the grid station and feeder. Charge phones and fill water tanks before 9 am, and call 118 if power has not returned well after 2 pm.
- Find the feeder name and subdivision printed on your LESCO bill.
- Open the Load Shedding and Shutdown Schedule page on LESCO's website.
- Open "Approved Shut Down on 17-11-2026".
- Search for your feeder name, or the grid station and subdivision.
- If supply stays off after the window, call 118 or send an SMS to 8118.
A shutdown is planned work, separate from load shedding. A guide to reading the LESCO shutdown schedule PDF explains the CIR and PTW columns. For daily load shedding hours, see the LESCO load shedding schedule. Complaints and service centres are in the LESCO complaint number list.

Common questions
What time is the LESCO shutdown on 17 November 2026?
215 of the 218 rows are listed from 9 am to 2 pm. Three Kasur circle rows print no time.
Which areas have the most feeders off?
Kasur circle has 54 entries and Southern Lahore 47. The DHA-1 grid in Defence has 33 feeders, the most of any grid.
Why is LESCO shutting these feeders?
The remarks column lists annual shutdowns, general maintenance, tree trimming, jumper and pole repairs, and operation safety.
Can power return before 2 pm?
Yes. The window is the approved time, and supply often returns once the crew finishes. Plan for the full window anyway.
Is my factory feeder included?
The industrial division has 15 entries, most on the 220 kV Sarfraz Nagar grid, plus factory feeders in other circles. Check your feeder code in the PDF.
Who do I call if power does not come back?
Call LESCO's helpline 118, or send an SMS to 8118, with your reference number.
How we verified this
What we checked and where we read it.
We read LESCO's Load Shedding and Shutdown Schedule page on 17 November 2026 at about 05:45 PKT and opened its file "Approved Shut Down on 17-11-2026", posted on 16 November. The counts by circle, grid station and time are ours, from the file's 218 numbered rows. Twenty rows print the feeder name on a separate line from the code, and three rows give no time; we have flagged both above rather than guess.
About the author

Senior Writer, Public Services and Technology
Shahid joined us in 2024 as an author. He is a senior contributor to Pakistan's leading technology websites. He writes detailed articles, mostly covering his expertise in the latest tech, mobiles, apps, gadgets, and step-by-step guides. His ideology is to help people understand the latest trends and explain complex methods through very easy-to-understand guides.




