Skip to content
Pakistan Era logo
Guides

How to Get a Second SNGPL Gas Connection for an Upper Portion

SNGPL gives a second RLNG gas meter for an upper or separate portion. See the Rs 20,000 security, service line charges, documents, steps and common problems.

Ali Akhtar, author at Pakistan EraAli Akhtar6 min read
A two storey brick house with a separate staircase to the upper floor in a quiet Lahore street

Yes, SNGPL gives a second gas connection for an upper or separate portion of a house, even if the lower portion already has a gas meter. The new meter is an RLNG connection. You apply as a fresh domestic applicant, and the charges are a Rs 20,000 refundable security plus Rs 1,500 service line charges for a house up to 10 marla, Rs 21,500 in all (Rs 3,000 service line above 10 marla).

Many families in Lahore, Rawalpindi and Peshawar build a second floor for a married son, or rent it out. One gas meter for two kitchens means one bill, arguments over who used what, and often a higher slab for everyone. A separate meter fixes that.

ItemWhat SNGPL charges or asks
Security deposit (refundable)Rs 20,000
Service line, house up to 10 marlaRs 1,500
Service line, house above 10 marlaRs 3,000
Fast track urgent fee (optional)Rs 25,000 extra
Instalments for connection chargesNot allowed

SNGPL allows an additional RLNG connection for a separate portion

SNGPL's own FAQ answers this exact case. If the lower portion has a system gas meter, you can still get an additional RLNG connection for the upper or other portion. You follow the normal policy, wait for your turn on merit, and provide the documents.

The key word is "separate portion". The new meter should serve its own kitchen and its own house line. OGRA's service standards for gas companies treat an additional meter as a new connection, so it goes through the same steps as any new home.

Two things stay the same. The old meter on the lower portion keeps its system gas rate, because SNGPL says old connections continue on local gas. Only the new meter is on RLNG.

SNGPL charges for a second RLNG gas connection for an upper portion

The second meter is billed at the RLNG flat rate, not the slab rate

An RLNG connection is billed at one flat rate per unit, notified by OGRA every month. It has no monthly fixed charges. Your old system gas meter stays on the slab rates, so the two portions will get two very different bills.

RLNG is imported gas, so it costs more than local gas. SNGPL's FAQ says it is still cheaper than LPG. The bill comes monthly, and supply hours are the same as for system gas.

PointOld meter (lower portion)New meter (upper portion)
Gas typeSystem (local) gasRLNG
How the price worksOGRA slabs, protected or non-protectedOne flat OGRA rate
Monthly fixed chargesYesNo
Bill frequencyMonthlyMonthly

The slab rates and fixed charges for the old meter are set out in the sui gas slab rates for 2026. Splitting one heavy meter into two lighter ones can also move the lower portion into a cheaper slab.

Old system gas meter compared with a new RLNG meter in the same house

Apply for the upper portion meter in six steps

Submit a new domestic RLNG application for the portion, online or at an SNGPL office. SNGPL surveys the house, sends a demand notice with a house line plan, and you install the line through a listed contractor. You then pay the security and service line charges and SNGPL fixes the meter.

  1. Fill the domestic RLNG application form, online at sngpl.com.pk, in the ConnectOn app, or at the nearest regional office or customer services centre. Tick "Normal Merit" or "Fast Track".
  2. Attach a valid CNIC copy and the property document (registry, transfer letter or fard). If the portion's applicant is not the owner, add the owner's NOC.
  3. Keep the acknowledgement receipt. You will need it to track the file.
  4. Wait for the house line survey. SNGPL's representative visits on turn and merit, and designs the house line plan.
  5. After the demand notice arrives, get the house line laid and tested by an SNGPL listed contractor, and collect the installation certificate.
  6. Sign the RLNG supply contract, take it with the plan and certificate to the office, get the challan, and pay the security and service line charges at a bank or online channel.

Online applications need a nearby consumer number, so keep your own lower portion bill or a neighbour's bill ready. The contractor rules are in the guide to the SNGPL house line installation certificate, and you can follow the file with the SNGPL application status check.

Six steps to apply for a second SNGPL gas meter for an upper portion

Whose name goes on the second meter matters

The application can be in the owner's name or in the name of the person living in the portion. A son or tenant who is not the owner needs the owner's NOC. A tenant's contract also carries the landlord's undertaking to pay any dues the tenant leaves behind.

If the portion is rented out, the landlord's undertaking matters. On the RLNG contract, the landlord states he will tell SNGPL when the tenant leaves and will clear any outstanding dues on demand. So many owners keep both meters in their own name and recover the bill from the tenant.

A change of user later is a free name transfer, explained in the SNGPL name change guide. For the electricity side of the same house, the rules for a separate electricity meter for a portion are different and are set by NEPRA.

Problems people hit, and the fix for each

Most delays come from three things: no gas main in front of the house, a property paper that does not show the portion, and unpaid dues on the existing meter. Each has a clear fix, and none needs an agent.

ProblemWhat to do
Online form asks for a consumer numberEnter the consumer number of the lower portion meter or a neighbour's bill
Survey says gas main is not in front of the houseThe connection cannot be laid until the main reaches you; ask the office about mains extension
Property paper does not show the upper portionGive the full house document; add an electricity bill to tally the address
Lower portion meter has unpaid duesClear the old bill first so there is no hold on the premises
Somebody asks for cash to speed it upRefuse. SNGPL says nobody can take cash; pay only at a bank or online channel

Do not run a pipe from the lower meter to the upper kitchen while you wait. SNGPL's contract treats any major addition to the gas installation without written approval as a ground to cancel the contract.

Common questions

Can I get a second gas meter for my upper portion if the lower portion already has one?

Yes. SNGPL's FAQ says you can get an additional RLNG connection for the separate portion, on turn and merit, with the required documents.

How much does a second SNGPL connection cost?

Rs 20,000 refundable security plus Rs 1,500 service line charges for a house up to 10 marla, or Rs 3,000 above 10 marla. Fast track adds Rs 25,000. The house line work is paid separately to the contractor.

Can I pay the connection charges in instalments?

No. SNGPL's FAQ says connection charges cannot be paid in instalments.

Will the new meter get local gas instead of RLNG?

No. New domestic connections are processed on RLNG. The ban on new system gas connections is still in place, according to SNGPL.

Will my old lower portion meter change to RLNG?

No. SNGPL says old system gas connections continue at the local gas rate. Only a connection disconnected for more than one year is reconnected on RLNG.

Can a tenant apply for the upper portion meter?

Yes, with a no objection certificate from the owner. The landlord signs an undertaking on the contract to clear the tenant's unpaid dues.

How we verified this

What we checked and where we read it.

We checked these SNGPL pages on 24 November 2026: the FAQs for domestic RLNG connections (the answer on an additional connection for an upper or other portion, charges, instalments, the system gas ban and the one year reconnection rule), the brief procedure for domestic RLNG connections (documents, survey, demand notice, house line and the charges table), and the domestic RLNG supply contract PDF (security clause, landlord's undertaking and the termination clause). The additional meter rule comes from OGRA's performance and service standards for gas companies. SNGPL's pages are at sngpl.com.pk, and OGRA's at ogra.org.pk.

About the author

Ali Akhtar, author at Pakistan Era

Tax, Bills and Technology Writer

Ali Akhtar

Ali Akhtar is a young and curious voice here at Pakistan Era. He is currently pursuing his A-Levels and has a growing interest in Pakistan’s changing industrial landscape and educational trends. Ali likes to write in a way that helps him explain and explore the world around him. His writing reflects the perspective of the new generation navigating the evolving trends of Pakistan where technology, youth innovation, and shifting opportunities are reshaping the country’s future.

TopicsSNGPLGas ConnectionRLNGSui GasPunjab