LESCO Shutdown Schedule 21 to 23 November 2026: 395 Feeders Off in Lahore, Sheikhupura, Kasur, Okara and Nankana
LESCO shutdown schedule 21 to 23 November 2026: 5 feeders Saturday, 211 Sunday, 179 Monday in Lahore, Sheikhupura, Kasur and Okara. Times and feeder lists.
یہ صفحہ اردو میں پڑھیں
LESCO has approved power shutdowns on 5 feeders on Saturday 21 November, 211 on Sunday 22 November and 179 on Monday 23 November 2026. Most cuts run from 9 am to 2 pm. Sunday is the big day: Sheikhupura circle alone has 71 entries, and the 220 kV Kala Shah Kaku grid goes off for its annual maintenance from 10 am to 3 pm.
The work is annual maintenance, tree trimming, jumper repairs and new panels, according to the remarks column in LESCO's approved file for the three days. Find your day, grid station and feeder below, then match the feeder name printed on your bill.
LESCO shutdowns on 21, 22 and 23 November at a glance
LESCO's file "Approved Shut Down on 21-22 and 23-11-2026" lists 395 numbered rows. Saturday has only 5, all in Lahore. Sunday has 211 across eight circles, and Monday has 179 across all nine. Almost every row reads 0900 to 1400.
| Day | Entries | Main time | Biggest areas |
|---|---|---|---|
| Saturday 21 November | 5 | 9 am to 2 pm (2 rows 9 am to 12 noon) | Gulshan-e-Ravi, Cantt, Raiwind Road (Fazaia grid) |
| Sunday 22 November | 211 | 9 am to 2 pm, some 10 am to 3 pm and 1 pm to 6 pm | Sheikhupura, Muridke, Gulberg, Okara, Shahkot |
| Monday 23 November | 179 | 9 am to 2 pm for every row | Kasur, Chunian, Allama Iqbal Town, Shalamar, Raiwind |

Saturday 21 November: five Lahore feeders
Saturday's list is short. Two feeders on the Gulshan Ravi grid and the CMH feeder on the Askari-X grid are off from 9 am to 2 pm. Two Fazaia feeders are off from 9 am to 12 noon, so LESCO can fit new outgoing panels.
- 132 kV Gulshan Ravi: Nonarian and Rustam Park (Nawankot subdivision), 9 am to 2 pm, for busbar, cross arm, insulator and jumper work and tree cutting.
- 132 kV Askari-X: CMH 1 and 2 (Saddar, Cantt), 9 am to 2 pm, general maintenance. The same feeder is on Sunday's list too.
- 132 kV Fazaia: Fazaia-1 and Fazaia-2 (Jia Bagga, Raiwind division), 9 am to 12 noon, to install two new 11 kV outgoing panels for the Edenabad feeders.
Sunday 22 November: 211 feeders, with three time windows
Sunday has the longest list. Sheikhupura circle has 71 entries, Southern Lahore 43 and Northern Lahore 31. Most rows run 9 am to 2 pm, but the Kala Shah Kaku and Shamkey feeders run 10 am to 3 pm, and Shahkot 1 pm to 6 pm.
| Circle (CIR number) | Entries on 22 November |
|---|---|
| Sheikhupura (6) | 71 |
| Southern Lahore (5) | 43 |
| Northern Lahore (1) | 31 |
| Okara (4) | 23 |
| Nankana (8) | 19 |
| Eastern Lahore (3) | 12 |
| Central Lahore (2) | 6 |
| Industrial division (9) | 6 |
| Total | 211 |
Lahore city on Sunday
- 132 kV Garden Town, 9 am to 2 pm (about 40 entries): Gulberg, Liberty and Ichhra feeders including D-1, D-2, Ghulab Devi, Zaid Hospital, Ichra More, Ghauri, Gulberg No.1, New Auriga, New Ichra East, Hockey Stadium, Central Plaza, BMJ Plaza, Madina Tower, Kalma Tower, Hali Road, Ashiana Shopping Mall, Askari Tower, Hyde Park, PCB and Idrees Shaheed. LESCO marks many of these as an annual shutdown.
- 132 kV Mcleod Road, 9 am to 2 pm: Anarkali, Royal Park, Lady Aitchison, High Court, Aibak Road, Awan-e-Iqbal and Wapda House.
- 132 kV Bhati Gate, 9 am to 2 pm: Faseel Road, Urdu Bazar, Ali Hajvari and Kachery Road.
- 132 kV Shahdara New: Faisal Park, Kala Khatai Road and factory feeders in Kot Abdul Malik.
Sheikhupura, Muridke and Shahkot on Sunday
- 132 kV ICI Public, Sheikhupura, 9 am to 2 pm (31 entries): Jandiala Road and Attabad feeders, including Mansoorabad, New Rupali, Zafarabad, Shekhu Garden, Quaid-e-Azam Apparel Park and mills such as Ayesha Textile, Noorani Textile, Ghani Glass, Chaudhry Textile and several paper mills.
- 220 kV Kala Shah Kaku, 10 am to 3 pm (18 feeders): Bughian Manawan, Old Industrial, OK Industries, SF No.1, No.2, No.4, No.5 and No.6, New Industrial, Lahore Cable, Haddoke and Zafar Park, in Muridke division.
- 132 kV Shamkey, mostly 10 am to 3 pm: Ali Park, PCO, Punjab Judicial Academy, S.A Garden 1 and 2, Qillah Kaler, Pakhyala and many steel mill feeders in Ferozewala and Ravi Rayon. The remarks say the cut is for the annual shutdown at the 220 kV Kala Shah Kaku grid.
- 132 kV Shahkot, 1 pm to 6 pm (18 entries): Gulistan and Shahkot City feeders, Farooq Nagar, Panwan and textile mill feeders such as Shadab, Suraj, Sandal Bar, Kashar and Crescent.
Okara and Depalpur on Sunday
- 132 kV Okara City-II, 9 am to 2 pm (18 entries): Shadman, Nizami, Faisalabad Road, District Complex, Fateh Town, Rehmat Pura and Rao Zia-ud-Din, for general maintenance.
- 132 kV Depalpur, 9 am to 2 pm: Sakhi Sydan, Farid Kot and Asadullah Pur.
- 132 kV Bhai Pheru, 9 am to 2 pm: six industrial division feeders, including Novelty, Ch. Dairy and Dewan Farooq.

Monday 23 November: 179 feeders, all 9 am to 2 pm
Monday's 179 rows all run from 9 am to 2 pm. Kasur circle leads with 53 entries, Eastern Lahore has 30 and Central Lahore 23. In the city, the Allama Iqbal Town grid has 19 feeders off, the most of any grid that day.
| Circle (CIR number) | Entries on 23 November |
|---|---|
| Kasur (7) | 53 |
| Eastern Lahore (3) | 30 |
| Central Lahore (2) | 23 |
| Sheikhupura (6) | 20 |
| Southern Lahore (5) | 14 |
| Okara (4) | 11 |
| Nankana (8) | 10 |
| Industrial division (9) | 10 |
| Northern Lahore (1) | 8 |
| Total | 179 |
- Lahore city: Ayubia, Gulshan Iqbal, Shah Kamal, Wahdat Colony, Canal View, Neelam, Raza Block, Mustafa Town-II and Habib Colony (Allama Iqbal grid); Shalamar Town, Barkat Steel, Model Steel and Data Flour Mill (Shalamar-I); Afzaal Park, Canal Forts Housing and Sahafi Colony feeders (Press Club grid); Siraj Park, Millat Road and Saggian Bridge (Saggian); Lidher (Defence); Guldasht Town (Ghazi New); Green Town (Township).
- Kasur: Khuddian Kasur, Dost Pura, Sikander Pura and Kotly Abu Bakar (Khuddian grid, 14 entries); Changa Manga, Jand Walla, Ghazi, Muhammadi Pura and Bhagoki (Chunian); Qadri (Ghaffar Chowk), Bulleh Shah and Chandni Chowk (Kasur New); Shah Inayat, New Changa Manga, Kasur Road, Awais Karni and Sidhu Pura (Kot Radha Kishan); Bhai Pheru-I, Kot Maji, Saharan Kay and Eid Gah Road in Phool Nagar (Bhai Pheru); Bahadar Pura (Kasur).
- Sheikhupura and Muridke: Muslim Park and Khyber Farm (Narang), Jinnah Park feeders (Ayesha grid), Canal Park (Sheranawala), plus Sheikhupura, Muridkey and Shamkey grid feeders.
- Raiwind industrial area: Nishat, Interloop, Superior Textile, Sehar Spinning, Eastern Spinning, Eastern Dairy and Omber Holding (Raiwind New grid).
- Okara and Nankana: Shahbore and Nizam Wala (Okara Cantt), Depalpur and Basirpur feeders, Bhool Chak (Nankana), Minhaj (Malik Pur), and Warburton and Mohlan feeders.
Check your feeder before the cut in five steps
Your bill names your feeder and subdivision. Open LESCO's shutdown page, open the 21 to 23 November file, and match the grid station and feeder. Charge phones and fill water tanks the night before, and call 118 if power stays off well after the window.
- Find the feeder name and subdivision printed on your LESCO bill.
- Open the Load Shedding and Shutdown Schedule page on LESCO's website.
- Open "Approved Shut Down on 21-22 and 23-11-2026". The file has 20 pages, one block for each day.
- Search for your feeder name, or the grid station and subdivision, under the right day.
- If supply stays off after the window, call 118 or send an SMS to 8118 with your reference number.
A shutdown is planned work, separate from load shedding. A guide to reading the LESCO shutdown schedule PDF explains the CIR and time columns. For daily load shedding hours, see the LESCO load shedding schedule. The last big list, for LESCO's 17 November shutdowns, had 218 feeders. Complaint numbers are in the LESCO complaint number list.

Common questions
What time is the LESCO shutdown on 22 November 2026?
Most rows run from 9 am to 2 pm. Kala Shah Kaku and most Shamkey feeders run from 10 am to 3 pm, and Shahkot feeders from 1 pm to 6 pm.
Is there a LESCO shutdown on Saturday 21 November?
Yes, on five feeders only: Nonarian, Rustam Park, CMH 1 and 2, Fazaia-1 and Fazaia-2. The Fazaia feeders are off from 9 am to 12 noon.
Which areas have the most feeders off on Monday?
Kasur circle has 53 entries, including Khuddian, Chunian, Kasur city and Kot Radha Kishan. In Lahore, the Allama Iqbal Town grid has 19 feeders off.
Why is the Kala Shah Kaku grid shut on Sunday?
LESCO's remarks call it the annual shutdown at the 220 kV Kala Shah Kaku grid. Feeders fed through it in Muridke and Ferozewala go off from 10 am to 3 pm.
Can power return before the window ends?
Yes. The window is the approved time, and supply often returns once the crew finishes. Plan for the full window anyway.
Who do I call if power does not come back?
Call LESCO's helpline 118, or send an SMS to 8118, with the reference number on your bill.
How we verified this
What we checked and where we read it.
We read LESCO's Load Shedding and Shutdown Schedule page on 20 November 2026 at about 14:30 PKT and opened its file "Approved Shut Down on 21-22 and 23-11-2026", posted on 20 November at about 13:26 PKT. The counts by day, circle, grid station and time are ours, from the file's 395 numbered rows. Some rows print the feeder name on a separate line from its code, so the name lists above are not complete; the PDF has every row.
About the author

Senior Writer, Public Services and Technology
Shahid joined us in 2024 as an author. He is a senior contributor to Pakistan's leading technology websites. He writes detailed articles, mostly covering his expertise in the latest tech, mobiles, apps, gadgets, and step-by-step guides. His ideology is to help people understand the latest trends and explain complex methods through very easy-to-understand guides.




