SPHF House Minimum Requirements in Sindh: 3 Foot Plinth, 9 Inch Walls and 200 Sq Ft
SPHF flood houses in Sindh need a 3 ft plinth, a 3 to 4 inch RCC band, 9 inch brick or 8 inch block walls, a 5% roof slope and 200 sq ft. Full rules by stage.

An SPHF flood house in Sindh must meet these minimum rules: a foundation dug at least 2 feet deep and 2.5 feet wide, a plinth at least 3 feet above average ground level, a 3 to 4 inch RCC band with two #4 bars on the plinth and over doors and windows, walls at least 9 inches (brick) or 8 inches (cement block), a roof sloping 5% to a drain pipe, and at least 200 sq ft covered, including one room and a latrine.
These rules matter for money. SPHF releases each instalment only after it certifies the stage, and a plinth or wall built below the minimum can hold up the next payment.
| Part of the house | SPHF minimum requirement |
|---|---|
| Foundation trench | At least 2 ft deep and 2.5 ft wide |
| Mortar | Cement sand mortar, ratio 1:6 |
| Plinth height | At least 3 ft above average ground level |
| Plinth band | RCC band at least 3 to 4 inches thick with two #4 bars |
| Walls | Brick at least 9 inches; cement block at least 8 inches, 1800 psi |
| Lintel band | RCC band over door and window openings, 3 to 4 inches, two #4 bars |
| Roof | 5% slope towards a drain pipe |
| Plinth apron | 2 ft apron around the plinth walls where applicable |
| Covered area | At least 200 sq ft, including a single room and a latrine |

SPHF sets minimum rules for four house types
SPHF publishes its rules as "Minimum requirements: flood resilient homes reconstruction" posters for four house types. All four have a katcha roof. They differ in wall material and foundation, but the plinth, band, roof and area rules are the same across them.
| House type on the SPHF poster | Walls | Foundation width in the drawing |
|---|---|---|
| Brick wall with katcha roof | Burnt brick, at least 9 inches | 13.5 inches |
| Cement block wall with katcha roof | Cement block, at least 8 inches | 12 inches |
| Stone foundation, cement block wall, katcha roof | Cement block, at least 8 inches | 18 inches |
| Stone foundation, brick wall, katcha roof | Burnt brick, at least 9 inches | 18 inches |
Each poster has a note at the bottom. The written points are the minimum requirement. The drawings also show good practice, such as a niche, a jafri or ventilator and space to add a veranda later. Pick the house type that matches the material you can get in your village.
The foundation and plinth decide the second instalment
The second instalment of Rs 100,000 follows a verified plinth. The check looks for a trench at least 2 feet deep and 2.5 feet wide, a plinth at least 3 feet above average ground level and an RCC band of 3 to 4 inches with two #4 bars.
The 3 foot plinth is the core of a flood resilient house. It raises the floor so that standing flood water is less likely to reach it. The RCC band ties the walls together so they do not split when the ground settles.
- Dig the trench at least 2 feet deep and 2.5 feet wide.
- Lay lean concrete at the bottom, then build the foundation in 1:6 cement sand mortar.
- Raise the plinth to at least 3 feet above the average ground level around the house.
- Lay a polythene sheet and bitumen layer as the drawing shows, to stop damp rising.
- Cast the RCC plinth band, 3 to 4 inches thick, with two #4 steel bars.
The instalment amounts and the stage each one follows are in the guide to SPHF instalments and stuck payments.

Walls and the lintel band come before the third instalment
The third instalment of Rs 100,000 follows verified walls up to roof level. Brick walls must be at least 9 inches thick and cement block walls at least 8 inches. Both use cement sand mortar, with an RCC lintel band over door and window openings.
The lintel band is a strip of concrete with two #4 bars that runs over every door and window. It is 3 to 4 inches thick. Cement blocks must be at least 1800 psi, so ask the block maker for that strength before you buy.
The roof needs a 5% slope and a drain pipe
The fourth and last instalment of Rs 25,000 follows a verified roof. The katcha roof must slope 5% towards a drain pipe, or parnala, so rain runs off instead of soaking in. A 2 foot apron around the plinth keeps water away from the walls.
The SPHF drawing builds the roof in layers. Steel girders or beams sit on 3 inch concrete pads. Bamboo of 3 inch diameter and a chick mat go over them, then a polythene sheet, 4 inches of compacted mud and a 2 inch screed or stabilised mud plaster on top. A 1 foot parapet wall runs around the edge.
Ask for a fresh check if a stage fails
If a stage is not approved, ask the implementing partner's field staff which requirement failed. Correct that part, take a photo, and ask for a new visit. If the visit does not come, call SPHF's complaint line on 021 111 222 400 and keep the token number.
Pay nobody to pass a stage. The house must meet the rules, and a bribe does not change what the next inspector sees. Your grant status, account opening and payments can be checked by CNIC, as shown in the guide to check the Sindh flood house grant status.
SPHF covers houses damaged in the 2022 floods. If a later rain or flood damaged your house again, the Sindh disaster authority takes relief complaints on 1736, separately from SPHF.
Common questions
How high must the plinth be for an SPHF house?
At least 3 feet above the average ground level around the house.
What is the minimum size of an SPHF house?
At least 200 sq ft of covered area, including a single room and a latrine.
How thick must the walls be?
At least 9 inches for burnt brick walls and at least 8 inches for cement block walls, with blocks of at least 1800 psi.
Can I build with stone?
Yes, for the foundation. SPHF has posters for a stone foundation with brick walls and a stone foundation with cement block walls.
What steel goes in the RCC band?
Two #4 bars, in a band at least 3 to 4 inches thick, on the plinth and over door and window openings.
Who checks my house?
The implementing partner's field staff verify each stage, and SPHF certifies it before the next instalment is released.
How we verified this
What we checked and where we read it.
Last checked 21 November 2026. Every requirement on this page comes from SPHF's four "Minimum requirements: flood resilient homes reconstruction" posters in the English IEC material on SPHF's IEC material page, dated June 2023. Urdu and Sindhi versions are on the same page.
The foundation widths in the second table are measurements shown in the drawings rather than written rules. The stage for each instalment comes from SPHF's grant poster in the same file. The complaint number is from the SPHF Beneficiary Platform, checked the same day.