IESCO net metering in 2026: apply online on PITC's portal, raise a load under 5 kW on ENC or Power Smart, the documents, and IESCO's net metering contact.

Ali Akhtar, author at Pakistan EraAli Akhtar5 min read
Solar panels on the roof of a white house with green hills behind in Islamabad, for IESCO net metering

IESCO net metering in 2026 is applied for online on PITC's net billing portal (nmp.pitc.com.pk): choose IESCO, enter your 14 digit reference number, and you or your certified installer complete the form. You need a 3 phase connection with at least 5 kW sanctioned load and a system no bigger than that load. If your load is too small, IESCO customers raise it on iesco.enc.com.pk, or on the Power Smart app in some divisions.

The Islamabad Electric Supply Company (IESCO) serves Islamabad, Rawalpindi, Attock, Jhelum and Chakwal. Two things decide whether an IESCO application can even start: a sanctioned load at least as large as the system, and a transformer with room left. Both can be checked before you spend anything.

IESCO net metering rules that apply in 2026

The NEPRA (Prosumer) Regulations, 2026 govern every new IESCO application. The system can be no bigger than your sanctioned load, up to 1 MW, and solar on your transformer must stay within 80% of its rating. Systems of 25 kW or less pay no NEPRA fee and need no NEPRA approval.

RuleWhat it means for an IESCO home
3 phase, 5 kW minimumA single phase house must upgrade first
System up to sanctioned loadA 10 kW load allows up to a 10 kW system
80% transformer limitA crowded street can block new applications
Nil NEPRA fee up to 25 kWMost homes pay only IESCO's meter estimate
Net billingExports bought at the national average purchase price

Exports under net billing earn far less than the retail rate you pay for imports, so self-use matters more than it did. The full rules and deadlines are in the net metering rules for 2026.

IESCO net metering rules in 2026 for homes in Islamabad and Rawalpindi

Raise your IESCO load first if it is below 5 kW

The portal does not change your load. IESCO customers apply for a load extension on IESCO's ENC site, iesco.enc.com.pk. Customers of IESCO divisions 1411 and 1412 and circles 142, 143, 145 and 146 use the Power Smart app or a customer facilitation centre instead.

Those codes are part of your reference number. In a 14 digit IESCO reference number, digits 3 and 4 are "14", IESCO's company code, and the digits after them identify the circle, division and subdivision. If your number continues 142, 143, 145, 146, 1411 or 1412 there, use the Power Smart app. Otherwise use ENC.

Your area codeWhere to apply for a load change
Division 1411 or 1412Power Smart app or customer facilitation centre
Circle 142, 143, 145 or 146Power Smart app or customer facilitation centre
Any other IESCO areaiesco.enc.com.pk

A load change adds to your security deposit and may need a new meter. The rates and documents are in how to extend your electricity load, and the cost of a three phase meter is on the IESCO new connection charges page. Once the load change is done, keep its tracking ID: the net billing form asks for it.

How to apply for IESCO net metering, step by step

The application is filed online. IESCO's field office then reviews it, signs the interconnection agreement, issues an estimate and installs the two-way meter after you pay. Under the 2026 rules the meter should go in within 15 working days of payment.

  1. Check the transformer: on nmp.pitc.com.pk, click "Check Transformer Overloading" and enter your reference number and planned size.
  2. Choose a certified installer on PPIB's list whose area includes ICT for Islamabad, or Punjab for Rawalpindi, Attock, Jhelum and Chakwal.
  3. Click "Apply For Net Billing (By Consumer)", pick "Convert to Net Meter", enter the reference number, choose IESCO and check eligibility.
  4. Enter the ENC or Power Smart tracking ID if you changed your load or tariff.
  5. Verify the installer with its portal password, then enter your details, system size, feeder and tariff.
  6. Add your CNIC, email, two mobiles and two witnesses' CNICs, upload the documents and submit.
  7. Pay IESCO's estimate when it arrives and keep the receipt with its date.
Steps to apply for IESCO net metering online in Islamabad and Rawalpindi

Documents for an IESCO net metering file

Download the 2026 forms from the PITC portal: NEPRA Schedules II to V and the Schedule I interconnection agreement with IESCO. Add your CNIC, a recent paid bill in the same name, the installer's technical papers and the inspection certificate.

  • CNIC copy of the applicant, plus company papers if a company applies.
  • Latest paid IESCO bill in the applicant's name. If it is in a previous owner's name, change the name on the bill first.
  • Panel and inverter data sheets. The inverter must be grid-tied with anti-islanding.
  • Single line diagram and a site plan showing the outside disconnect switch.
  • Customer agreement with the installer and its inspection certificate.
  • For a system above 25 kW: NEPRA's fee of Rs 1,000 per kW and the concurrence papers.

IESCO contacts for net metering

PITC's directory of focal persons lists IESCO's net metering contact as a Deputy Director, Planning and Engineering, on 0319-5991526. For faults, outages and bill complaints, call 118. IESCO's customer care centres handle walk-in queries.

Other numbers are in the IESCO complaint number list. Track the file with a net metering application status check. If IESCO misses a deadline, write to the SDO, then file a net metering complaint to NEPRA.

Minimum IESCO load for net metering

Common questions

How do I apply for IESCO net metering?

Online on PITC's net billing portal, choosing IESCO and entering your 14 digit reference number. A certified installer can apply for you.

Where do I raise my IESCO sanctioned load for solar?

On iesco.enc.com.pk, or on the Power Smart app if you are in IESCO divisions 1411 or 1412 or circles 142, 143, 145 or 146.

What is the minimum load for IESCO net metering?

5 kW sanctioned load on a 3 phase connection, as the PITC form requires.

Is there a fee for IESCO net metering?

No NEPRA fee for systems up to 25 kW. You pay IESCO's estimate for the two-way meter and connection.

Who do I call about IESCO net metering?

IESCO's net metering focal person in PITC's directory is on 0319-5991526. Faults go to 118.

How big a solar system can I install with IESCO?

No bigger than your sanctioned load, up to 1 MW, and only if your transformer has room under the 80% rule.

How we verified this

What we checked and where we read it.

Checked on 15 November 2026 on PITC's net billing portal: the consumer application form, the transformer check, the home page message on load extensions (iesco.enc.com.pk, and the Power Smart app for divisions 1411 and 1412 and circles 142, 143, 145 and 146), the installer guidelines and the directory of focal persons. IESCO's own website links to the IESCO Smart and Power Smart apps and to iesco.enc.com.pk; we found no separate net metering page on it. The reading of the reference number digits follows the portal's own form, which takes the company code from digits 3 and 4. The 2026 rules come from the NEPRA (Prosumer) Regulations, 2026 and S.R.O. 709(I)/2026 and S.R.O. 1330(I)/2026 on nepra.org.pk.

About the author

Ali Akhtar, author at Pakistan Era

Tax, Bills and Technology Writer

Ali Akhtar

Ali Akhtar is a young and curious voice here at Pakistan Era. He is currently pursuing his A-Levels and has a growing interest in Pakistan’s changing industrial landscape and educational trends. Ali likes to write in a way that helps him explain and explore the world around him. His writing reflects the perspective of the new generation navigating the evolving trends of Pakistan where technology, youth innovation, and shifting opportunities are reshaping the country’s future.

TopicsIESCONet MeteringSolarIslamabadRawalpindi