QESCO Net Metering 2026 in Balochistan: Apply Online, the Documents, and Why the Old 30% Transformer Limit Is Gone

QESCO net metering in 2026: apply online on PITC's portal, the documents and the 5 kW minimum load. The transformer limit is now 80%, not QESCO's old 30%.

Ali Akhtar, author at Pakistan EraAli Akhtar5 min read
Solar panels on a flat roof with brown mountains behind under a blue sky in Quetta, for QESCO net metering

QESCO net metering in 2026 is applied for online on PITC's net billing portal (nmp.pitc.com.pk): choose QESCO, enter your 14 digit reference number, and you or a certified installer complete the form. You need a 3 phase connection with at least 5 kW sanctioned load and a solar system no bigger than that load. QESCO's net metering focal person in PITC's directory is on 0317-8486779.

The Quetta Electric Supply Company (QESCO) supplies most of Balochistan. QESCO's net metering page still carries an SOP and a checklist from the 2015 regime, including an Electrical Inspector certificate and a 30% transformer limit. The 2026 rules changed both.

QESCO net metering rules that apply in 2026

Every new QESCO application follows the NEPRA (Prosumer) Regulations, 2026. Your system can be no bigger than your sanctioned load, up to 1 MW. Solar on your transformer, with yours, must stay within 80% of its rating, and systems of 25 kW or less pay no NEPRA fee.

Rule2026 positionQESCO's older papers
Transformer limit80% of rating30% of the upstream transformer
System sizeNo more than sanctioned load, up to 1 MWUp to 1,000 kW
Fee up to 25 kWNil, no NEPRA approvalGeneration licence forms
Where to applyPITC net billing portalThe concerned QESCO office
InspectionCertified installer's inspection certificateElectrical Inspector certificate

QESCO's old SOP approved solar "until the grid connected Solar PV installed capacity reaches 30%" of the transformer. The 2026 regulations set 80%, so many transformers that looked full under the old rule may now have room. Check yours on the portal. The full set of rules is in the net metering rules for 2026.

QESCO net metering 2026 rules compared with QESCO's older SOP and checklist

Before you apply: check load, name, transformer and installer

Four checks come first. A 3 phase connection with at least 5 kW, a bill in your name, room on the transformer, and a certified installer allowed to work in Balochistan. Each one stops the application on the portal if it is missing.

  • Load: read the sanctioned load and phase on your QESCO bill. A smaller or single phase connection needs a change of load on ENC first.
  • Name: QESCO's checklist says the applicant and the bill must carry the same name.
  • Transformer: on nmp.pitc.com.pk, click "Check Transformer Overloading" and enter your reference number and planned size.
  • Installer: PPIB's certified lists show the areas each installer covers. Many cover only ICT, Punjab, Sindh and KPK, so look for Balochistan in the area column.

QESCO also publishes a "Feeder-wise detail for installation of net metering" sheet with the capacity available on 44 feeders, many of them in Quetta, Khuzdar, Gwadar, Turbat and Panjgur. It is a useful first look before the transformer check.

How to apply for QESCO net metering, step by step

The application is filed online, and QESCO's office takes it from there. Under the 2026 rules QESCO must acknowledge within 5 working days, review within 15, sign within 7, estimate within 7, and install within 15 working days of payment.

  1. Open nmp.pitc.com.pk and click "Apply For Net Billing (By Consumer)", or let your installer use the installer button.
  2. Choose "Convert to Net Meter", enter the 14 digit reference number, pick QESCO and check eligibility.
  3. Verify the installer with its portal password.
  4. Enter your details in English, the system size in kW, and the feeder and tariff from your bill.
  5. Add your CNIC, email, two mobile numbers and two witnesses' CNICs.
  6. Upload the documents and submit. Save the tracking ID.
  7. Pay QESCO's estimate for the two-way meter and connection work.
Steps to apply for QESCO net metering online in Quetta and Balochistan

Documents for a QESCO net metering file

Use the 2026 forms from the PITC portal: NEPRA Schedules II to V and the Schedule I interconnection agreement. Add your CNIC, last paid bill, panel and inverter data, a single line diagram, a site plan and the installer's inspection certificate.

DocumentNotes
NEPRA Schedules II to VFrom the PITC portal, the 2026 set
Schedule I interconnection agreementBetween you and QESCO
Attested CNIC and last paid billSame name on both
Panel and inverter data, single line diagramFrom the installer; inverter must be grid-tied
Site plan with the outside disconnect switchFrom the installer

QESCO's old checklist asked for a certificate from the Electric Inspector, Quetta Region, at the Civil Secretariat on Zarghoon Road. Under the 2026 portal process, the inspection certificate comes from the certified installer. For a large system, or if QESCO's office asks for it in writing, the Electric Inspector is still the provincial authority for electrical safety.

QESCO offices and contacts for net metering

QESCO's net metering work is run by its Planning and Engineering Directorate at QESCO Headquarters, Zarghoon Road, Quetta. Its old SOP split the registering office by size: Deputy Manager Operation up to 70 kW, Manager Operation up to 500 kW, and the Chief Engineer (P&E) above 500 kW.

  • QESCO net metering focal person in PITC's directory: an Assistant Manager (Demand Forecast), MIRAD, on 0317-8486779.
  • Faults, outages and bills: 118, and the numbers in the QESCO complaint number list.
  • Electricity theft reports: QESCO's toll free line, 0800-84338.

Follow your file with a net metering application status check. If QESCO misses a deadline, write to the office first, then use the NEPRA net metering complaint route.

Transformer limit for solar under 2026 rules

Common questions

How do I apply for QESCO net metering?

Online on PITC's net billing portal, choosing QESCO and entering your reference number. A certified installer can apply for you.

Is QESCO's 30% transformer limit still in force?

No. The NEPRA (Prosumer) Regulations, 2026 set the limit at 80% of the transformer's rating.

Do I need an Electrical Inspector certificate for QESCO?

QESCO's old checklist asked for one. The 2026 portal process uses the certified installer's inspection certificate. Ask QESCO in writing if your office still wants the Inspector's certificate.

What is the minimum load for QESCO net metering?

5 kW sanctioned load on a 3 phase connection, as the PITC form requires.

Is there a fee for QESCO net metering?

No NEPRA fee up to 25 kW. You pay QESCO's estimate for the two-way meter and connection work.

Which installers can work in Balochistan?

Companies on PPIB's certified list whose area column includes Balochistan.

How we verified this

What we checked and where we read it.

Checked on 15 November 2026 on QESCO's net metering page: its "Checklist for filing net metering applications", the Net Metering SOP of the Planning and Engineering Directorate, and the feeder-wise detail sheet (44 feeders). The page's news line is dated 20 April 2022, and its "List of QESCO feeders" link returns an error page. On PITC's net billing portal we read the consumer form, the document downloads and the directory of focal persons. The 2026 rules come from the NEPRA (Prosumer) Regulations, 2026 and S.R.O. 709(I)/2026 and S.R.O. 1330(I)/2026 on nepra.org.pk.

About the author

Ali Akhtar, author at Pakistan Era

Tax, Bills and Technology Writer

Ali Akhtar

Ali Akhtar is a young and curious voice here at Pakistan Era. He is currently pursuing his A-Levels and has a growing interest in Pakistan’s changing industrial landscape and educational trends. Ali likes to write in a way that helps him explain and explore the world around him. His writing reflects the perspective of the new generation navigating the evolving trends of Pakistan where technology, youth innovation, and shifting opportunities are reshaping the country’s future.

TopicsQESCONet MeteringSolarQuettaBalochistan